Profile · New Zealand Under construction

Datagrid

Datagrid is a New Zealand data centre developer building a campus at Makarewa near Invercargill, the largest data centre project in the country by disclosed capacity, consented in March 2026, under construction since August 2026 and targeting a first phase opening in 2028.

Headquarters
Auckland
Founded
2021
Sites
1 under construction
Ownership
DG Founders, led by Rémi Galasso, with Mercury holding 12.7 per cent (privately held)
New Zealand sites
280MW planned Makarewa campus, Near Invercargill, Southland
Datagrid's Makarewa campus is under construction. Every figure below is design capacity, and financing remains subject to confirmation.

Datagrid was founded in 2021 by Rémi Galasso, founder of the Hawaiki submarine cable, and CallPlus founder Malcolm Dick. Galasso is chief executive and chair; Perrine Dhalluin is head of construction and Benjamin Black head of technology. Its Singapore-based backer BW Digital held about 37.5 per cent, an interest Galasso's DG Founders vehicle moved to acquire in 2025. Mercury became a shareholder in July 2026.

Datagrid's flagship project sits on 49 hectares at Makarewa, about 7 kilometres north of Invercargill in Southland. Environment Southland, Southland District Council and Invercargill City Council granted resource consent in March 2026 on a non-notified basis, which RNZ and 1News reported as the first New Zealand data centre approved that way. The site holds a 360MW grid connection and an initial data centre design of 280MW, a distinction Galasso set out on 24 July 2026. HEB Construction began the horizontal works in August 2026, and the company targets a first phase opening in 2028, with the University of Otago named as a future anchor tenant.

Financing

Datagrid has not confirmed the capital for the build. Public reporting carries cost estimates between about NZ$3.4 billion and about NZ$5.1 billion depending on the scope described, none of them confirmed by the company.

Energy

Datagrid holds a 15-year power purchase option with Mercury for up to 140MW, covering about half of the initial 280MW design. It is an option rather than a firm supply contract. Mercury also paid US$30 million for 12.7 per cent of the company in July 2026, four months after the power agreement was signed, becoming the first outside shareholder taken on since the BW Digital buyout began. Galasso has said the arrangement does not lock Datagrid in, that the company can continue to work with other gentailers, and that information barriers are in place to keep competition between generators fair. Datagrid describes the campus as running on more than 90 per cent renewable electricity, drawing on Manapouri hydro generation.

Water

Datagrid's Environment Southland permit, dated 11 March 2026, sets a ceiling of 7 litres a second, or 604,800 litres a day and about 220 million litres a year. A consent ceiling is a maximum rather than a forecast of use. Galasso has said Southland's climate allows a closed-loop liquid system cooled by outside air, so that for most of the year the campus would draw no water at all, and that the facility is engineered to target one of the lowest water consumption figures in the Asia Pacific. He has said firm volumes will follow once the design is finalised.

Connectivity

Datagrid contracted phase one of the Tasman Ring Network with ASN and OMS Group on 31 July 2026: a 2,300km system running from Invercargill to a landing at Torquay in Victoria, specified at a minimum of eight fibre pairs and at least 160Tbps of design capacity, with service targeted for 2029. It would be the first international submarine cable to land in the South Island. The wider system of about 6,000 kilometres is an option to build at a later stage rather than a contracted commitment. Galasso has put the latency reduction against North Island routes at up to 45 per cent, and Datagrid head of connectivity Pierre-Emmanuel Goiffon, speaking to iTnews on 31 July 2026, put it at a minimum of 19 milliseconds round trip. Galasso describes the Southland campus as the anchor tenant that makes the cable viable.

Every figure attributed
Ownership
DG Founders, led by Rémi Galasso, with Mercury holding 12.7 per cent (privately held)
HQ
Auckland
Founded
2021
Status
under construction since August 2026, consented March 2026
Flagship
Makarewa campus near Invercargill
Grid connection
360MW
Initial data centre design
280MW
Future anchor tenant
University of Otago.
Makarewa campus
Near Invercargill, Southland
Capacity
280MW planned
Under construction
Rémi Galasso
CEO and chair
Perrine Dhalluin
Head of construction
Benjamin Black
Head of technology
2021
Founded
Rémi Galasso, founder of the Hawaiki submarine cable, and CallPlus founder Malcolm Dick establish Datagrid.
2025
Ownership consolidates
Galasso's DG Founders vehicle moves to acquire the roughly 37.5 per cent interest held by Singapore-based BW Digital.
March 2026
Resource consent granted
Environment Southland, Southland District Council and Invercargill City Council grant consent on a non-notified basis for the campus on 49 hectares at Makarewa.
March 2026
Power agreed
Mercury and Datagrid sign a 15-year power purchase option for up to 140MW.
July 2026
Mercury takes equity
Mercury pays US$30 million for 12.7 per cent, the first outside shareholding since BW Digital exited.
July 2026
Cable contracted
Datagrid contracts phase one of the Tasman Ring Network with ASN and OMS Group, 2,300km from Invercargill to Torquay in Victoria.
August 2026
Construction begins
HEB Construction starts the roading and earthworks at the 49-hectare campus, with the foundation platform for the data centre, substation and cable landing station due by the end of 2026.
2028
First phase targeted to open
With the University of Otago named as a future anchor tenant.
2029
Tasman Ring phase one targeted for service
Still unresolved
Financing

Datagrid has not confirmed the capital for the build, and reported cost estimates span about NZ$3.4 billion to about NZ$5.1 billion depending on scope.

Final load and water

The data centre design is being optimised around the chips a future tenant selects, and Galasso has said the final load and firm water volumes will follow the finalised design.

Grid connection

Transpower's connection work sits between the consent and the 2028 opening target.

Resource consent decisions, Makarewa campus Environment Southland, Southland District Council and Invercargill City Council March 2026
Ownership, leadership and project scope Datagrid company statements
Power purchase option agreement, up to 140MW over 15 years Company and counterparty statements
Tasman Ring Network route, length and service target Project statements
What is Datagrid?

Datagrid is a New Zealand data centre developer founded in 2021, building a campus on 49 hectares at Makarewa, about 7 kilometres north of Invercargill in Southland. The site holds a 360MW grid connection and an initial data centre design of 280MW, the largest data centre project in New Zealand by disclosed capacity.

Has Datagrid's data centre been approved?

Yes. Environment Southland, Southland District Council and Invercargill City Council granted resource consent in March 2026 on a non-notified basis, which RNZ and 1News reported as the first New Zealand data centre approved that way. The build remains subject to financing, which the company has not confirmed.

How much water will Datagrid use?

Its Environment Southland permit, dated 11 March 2026, allows up to 7 litres a second, about 220 million litres a year. That figure is a ceiling rather than a forecast. Galasso has said the design relies on outside air for most of the year and that firm volumes will follow the finalised design.

How will Datagrid be powered?

Datagrid holds a 15-year power purchase option with Mercury for up to 140MW, covering about half the initial design, and Mercury holds 12.7 per cent of the company. Datagrid describes the campus as running on more than 90 per cent renewable electricity, drawing on Manapouri hydro generation.

Who is behind Datagrid?

Datagrid was founded in 2021 by Hawaiki cable founder Rémi Galasso and CallPlus founder Malcolm Dick. Galasso is chief executive and chair. Singapore-based BW Digital held about 37.5 per cent, an interest DG Founders moved to acquire in 2025, and Mercury became a shareholder in July 2026.

Profile last updated 14 September 2026. Figures are company or shareholder-reported unless otherwise attributed. This profile covers New Zealand operations. Companies may request corrections or provide additional context using the form above.